# Notice of Cancellation

> How TradeGuard checks a notice-of-cancellation requirement, per policy, and how to record a waiver when a carrier can't add the notice.

# Notice of cancellation

A notice-of-cancellation requirement asks that the subcontractor's insurer gives you a set number of days' notice (30 by default) before a policy is canceled. You add it to a compliance profile in the dashboard or through the API ([Set up a compliance profile by API](/getting-started/set-up-a-compliance-profile-by-api)), like any other requirement.

## How it's checked

| What the documents show                                                                                                         | Result                                                                        |
| ------------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------- |
| A notice period of at least the required days                                                                                   | **Met**                                                                       |
| A notice period shorter than required                                                                                           | **Not met**                                                                   |
| The standard ACORD 25 wording only ("notice will be delivered in accordance with the policy provisions") with no number of days | **Not met**: that wording doesn't promise the notice the requirement asks for |
| No cancellation wording at all                                                                                                  | **Not met**, shown as "Not on the certificate"                                |

A **preferred** requirement never makes the subcontractor non-compliant: a shortfall shows as a warning instead. For an existing sub with **enforce endorsements at renewal** on, a missing notice of cancellation endorsement shows as "Endorsement due at renewal" until the policy renews (see [Existing Subs and Track-only Tags](/getting-started/existing-subs-and-track-only-tags)).

### Which policies

When you set up the requirement you can choose which policies it applies to: general liability, auto liability, workers' comp and/or umbrella. Each chosen policy gets its own row in the results (key `notice_of_cancellation:minimum_days:<policyType>`, for example `notice_of_cancellation:minimum_days:general_liability`). Choose none and the requirement covers every policy on the certificate in a single row (key `notice_of_cancellation:minimum_days`), which is met only when every policy on file shows the notice or is waived.

### Endorsement pages

Each policy's row is judged on that policy's own notice-of-cancellation endorsement page when one is on file, and on the certificate's cancellation wording otherwise. TradeGuard reads endorsement pages attached to the certificate, endorsement pages from an earlier certificate for the same policy, and endorsement documents you upload separately (document category `endorsement`; see [Endorsement Rules](/getting-started/endorsement-rules) for how to upload one). Uploading one re-checks the requirement. A page for a different policy number (for example, last year's policy) doesn't count.

Some notice pages don't print a policy number or name a policy type. A common one is form IL 80 01 ("Notice of cancellation to third party"), which amends a businessowners policy. TradeGuard ties such a page to a policy this way:

| The page                                                                             | Tied to                                                                                                                                |
| ------------------------------------------------------------------------------------ | -------------------------------------------------------------------------------------------------------------------------------------- |
| Prints a policy number you have on file                                              | That policy                                                                                                                            |
| No policy number, attached to a certificate whose policies all come from one insurer | Every policy on that certificate (the row's evidence says it was matched by insurer)                                                   |
| Anything else, including a separate file with no policy number                       | Nothing yet: a failing row goes to TradeGuard's review team (`outcome: "needs_review"`, requirement `under_review`) instead of failing |

A page TradeGuard can't tie to a policy is never ignored. The compliance record's `checkResult.externalResponse.unplacedEndorsementPages` lists those pages (document, page, form number and days).

### The result row

Each row in a compliance record's `checkResult.criteriaResults` carries:

| Field        | Value                                                                                                                                             |
| ------------ | ------------------------------------------------------------------------------------------------------------------------------------------------- |
| `outcome`    | `pass`, `fail`, `not_on_certificate`, `waived`, or `needs_review` (a notice page that couldn't be tied to a policy, being reviewed by TradeGuard) |
| `passed`     | `true` for `pass` and `waived`                                                                                                                    |
| `policyType` | The policy the row is about, or `null` for the single "every policy" row                                                                          |
| `evidence`   | Where the notice was read: the document and, for an endorsement page, the page and form number                                                    |

## Waivers: when the carrier can't add the notice

Some carriers can't add a notice-of-cancellation endorsement to a policy. When the subcontractor or their broker tells you so, record a **waiver** for that policy. The notice-of-cancellation row for that policy then reads **Waived** (`outcome: "waived"`) and counts as met. Every other check on that policy still runs.

A waiver is:

* **Per policy number.** When the policy renews with a new number, the waiver no longer applies and the check runs again, so you confirm once more.
* **Private to your organization.** Another GC working with the same subcontractor doesn't see it or benefit from it.
* **Recorded with its reason and who said it**, and kept after it's revoked for the audit trail.
* **Visible to TradeGuard's operations team**, who can also record one for you.

### Record a waiver in the dashboard

Open the subcontractor, go to **Requirements**, open the notice-of-cancellation requirement, and choose **Record waiver**. Pick the policy, then enter the reason and who told you. The requirement is re-checked straight away.

To undo it, choose **Revoke** next to the waiver.

### Record a waiver with the API

```bash
curl -X POST https://api.tradeguardins.com/v1/subcontractors/$SUB_ID/noc-waivers \
  -H "Authorization: Bearer $TRADEGUARD_API_KEY" \
  -H "Content-Type: application/json" \
  -d '{
    "policyType": "automobile_liability",
    "policyNumber": "BA-1234567",
    "reason": "Carrier does not offer a notice-of-cancellation endorsement on this policy.",
    "givenBy": "Pat Lee, ABC Insurance (pat@abcins.com)",
    "source": "email"
  }'
```

* `policyNumber` can be left out when the subcontractor has exactly one policy of that type on file.
* `source` is how the waiver reached you: `ops` (recorded by hand, the default), `email` or `portal`. Link the email with `communicationId` (one of your TradeGuard communications with this sub). Otherwise, say where it came from in `reason`.
* The key needs the `compliance:write` scope (`compliance:read` to list).

The response is `201` with the waiver. The subcontractor's notice-of-cancellation requirements are re-checked in the background; listen for `compliance.status_changed` or read the compliance record to see the new result.

| Call                                                                 | What it does                                                                                                                             |
| -------------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------- |
| `GET /v1/subcontractors/{subcontractorId}/noc-waivers`               | Your waivers for the subcontractor, plus the policies on file and which waiver covers each. Add `?includeRevoked=true` for revoked ones. |
| `POST /v1/subcontractors/{subcontractorId}/noc-waivers`              | Record a waiver. `409` if a live waiver already covers that policy.                                                                      |
| `DELETE /v1/subcontractors/{subcontractorId}/noc-waivers/{waiverId}` | Revoke it, with an optional `reason`. The check applies again on the re-check.                                                           |

> **Note**
>
> A waiver is not a manual override. An override sets a whole requirement's verdict by hand and clears when a new certificate arrives. A waiver only skips the notice-of-cancellation check for one policy number and stays in place across new certificates for that policy.